Tile replacement steps

What is the tile roof replacement process in Florida?

A tile roof replacement starts with an inspection. Then the old tile and underlayment come off, the deck is repaired and nailed to code, and new underlayment and flashing go down. The new tile goes on last. The tile sheds the water, and the layers under it back it up.

A new tile roof is more than new tile. Here is each stage, in order, and what to ask a roofer at every step.

Licensed & InsuredFlorida CCC1331076
4.7 stars65+ Google reviews
10 yearsFlorida-licensed
2,000+Roofs completed
The overview

How is a tile roof replaced?

The old tile and underlayment come off, the deck is fixed, new waterproofing goes down, and the tile goes back on last.

A tile roof replacement is a rebuild from the deck up. The new tile is the last thing installed, not the first. Under it are the roof deck (the wood sheets or boards), the underlayment (the waterproof layer over the deck) and the flashing (thin metal or membrane that seals the roof at edges, valleys and pipes).

The Florida installation manual from FRSA and the Tile Roofing Industry Alliance, the trade groups for Florida roofers and tile makers, calls tile a water shedding assembly. Tile sheds most of the water, and the layers underneath back it up. The manual says how well the whole system works depends on proper installation of every component. So the work under the tile matters as much as the tile you see.

A tile job usually goes in this order, according to the Journal of Light Construction: inspection, decisions by the owner, tear-off, deck repair, underlayment and flashing, then tile. The next section walks through each stage. This is general information about how a Florida tile replacement works. Your roof, your tile maker and your county may add steps.

If you are still weighing replacement against repair, start with tile roof cracking: repair or replace. For cost, see our tile roof cost guide. Coastline does tile roof repair and replacement, so the tile roofing page has more on what we handle.

Thinking about replacing a tile roof?

Coastline does tile roof repair and replacement, and Josh usually flies a drone over a tile roof first. Tell us your town and what your roof is doing, and we will tell you what happens next. Coastline Roofing works all over Florida (license CCC1331076).

Call (941) 896-7793 or text your town and a photo.

The process

What are the steps in a tile roof replacement?

Eight stages, from the first look at the roof to the last tile on the ridge.

  1. Inspect the roof and decide

    The JLC article says the condition of the underlayment is what decides between repairing and replacing a tile roof. For a tile roof, Josh usually flies a drone over the roof first, which shows cracked or slipped tile and the state of the ridge without anyone walking on it. See walking on a tile roof without cracking tiles for why that matters.

  2. Plan the permit, the tile and the access

    Your county sets the permit rules. Our roof permit guide and Manatee County permit guide cover them. This is also when you pick tile. If your old tile is discontinued, see replacement roof tiles discontinued.

  3. Protect the house and the yard

    The JLC article says crews warn owners about shaking and dust, and cordon off the work area. Tile is heavy, so the crew needs room for a truck or dumpster. The same article says tile roofs weigh about 1,000 pounds per square. A square is 100 square feet of roof.

  4. Tear off the old tile and underlayment

    Tile comes off first, then the old underlayment and any worn flashing. The JLC article says much of the old tile is recycled rather than saved. Under Florida's code, damaged, cracked or broken tile cannot be reinstalled. Our lift and relay guide covers when old tile can go back on.

  5. Repair and nail the deck

    Rotted or damaged deck boards are replaced. The deck is then fastened to the code. The JLC article says sheathing has to be nailed with 8d ring-shank nails at 6 inches on center in the field. The tile manual says sheathing must be at least 15/32 inch plywood or nominal 1 inch lumber, or another approved material.

  6. Lay the underlayment and flashing

    The tile manual says not to install underlayment over a wet surface. It requires self-adhered underlayment of at least 40 mils in a single-ply system and lists the flashing details at eaves, valleys, walls and pipes. Section 553.844 of the Florida Statutes says a roof replacement on a site-built single-family home must include a secondary water barrier. See tile roof underlayment replacement.

  7. Add battens and load the tile

    Battens are thin strips of wood that tile can be attached to. The manual says battens are optional on roofs with a pitch of 4:12 and above, and elevated or counter batten systems need a Florida product approval. The manual also says tile stacks must be spread evenly, not piled in one spot, and the underlayment must be protected while tile is loaded.

  8. Set the tile, hips and ridge

    Tile starts at the eave and must overhang the eave line by at least 3/4 inch but not more than 2 inches. Tile is held on by nails, screws, foam adhesive or mortar. Hips and ridges, the sloped and top lines where roof planes meet, finish the job. Ask your county which inspections apply and when.

Attachment

How are the tiles held on?

By nails or screws, foam adhesive or mortar. The manual sets rules for each one, and the system has to meet Florida's wind code.

Florida's wind rules are strict, so each tile has to be fastened in a way that resists wind. The FRSA and TRI manual says tile has to be attached to resist the wind pressure for the building, calculated using the local building code. Here is how the three common methods compare.

How tile is attached to a Florida roof, per the FRSA and TRI manual
MethodWhat it isWhat the manual requires
Nails or screwsFasteners driven through the tile into the deck or a batten.Nails must be corrosion resistant and meet a minimum ASTM A641 Class 1 standard. Allowable uplift for mechanically attached tile is listed in the manual's Table 3.
Foam adhesiveA polyurethane adhesive that glues tile to the underlayment or deck.Foam applied systems require a Florida Building Code product approval. Follow the foam maker's instructions.
MortarA cement and sand mix that bonds the tile.Mortar for field tile must be factory premixed and bagged with a Florida product approval. Job-site mixes are for cosmetic use and weather block only.

Which one is used depends on the tile profile, the roof pitch and the product approval for your tile. Our foam set vs mortar set guide compares them for homeowners. If you are choosing a tile type, see concrete vs clay roof tile and barrel vs flat tile.

What can change the plan

What can change a tile roof replacement?

Six things that decide the scope, the schedule and the surprises.

The weight on your framing

The Tile Roofing Industry Alliance says the roof structure needs to support the weight of tile. If your house did not carry tile before, it says an inspection will determine whether more support is needed. See switching from shingle to tile.

The condition of the underlayment

The JLC article says underlayment condition decides between repair and replacement. If it has worn out, the tile has to come off to replace it, even if the tile looks fine.

Roof pitch

Pitch (the steepness of the roof) changes how the manual treats battens, underlayment plies and flashing. Roofs below 4:12 follow different rows of the manual's chart. See roof pitch explained.

Reusing the old tile

Florida's residential code allows existing clay or cement tile to be reinstalled, except damaged, cracked or broken pieces. That can save tile, but it depends on how much of yours is sound.

Rain and Florida weather

Crews cancel or stop tear-off when the forecast turns bad, because the roof has to be covered the same day. Read what if it rains during roof replacement.

What the deck looks like

Rot, light nailing or a second layer only show up after tear-off. See what roofers find during tear-off.

Before you sign

What should you ask a roofer about a tile replacement?

Ask what is going under the tile, how the tile will be attached, and how the roof will be protected each night.

Most homeowners judge a tile bid by the tile. The better question is what goes beneath it. Ask:

  • What underlayment will you use, and does it meet the tile manual's 40-mil minimum if it is self-adhered?
  • How will the tile be attached: nails, screws, foam or mortar, and what is the product approval?
  • Will battens be used?
  • What happens to the old tile, and can any be reused?
  • How will you protect the open roof if rain comes?
  • Who inspects the finished roof for the county?

For a side-by-side look at two bids, use how to compare two roof quotes. For prep and staying home during the job, see how to prepare for a roof replacement and can you stay home during a roof replacement. Coastline also serves Sarasota and Lakewood Ranch.

Reviews

What homeowners say about working with Coastline

★★★★★
"From beginning to end the roof was done in 2 days. One night the crew stayed until 8:00. Each evening before leaving the crew ensured the yard was cleaned. We are so happy, and our roof is beautiful!"
Sharon T.Roof replacement
★★★★★
"Russell was great to work with. He was prompt in coming out to assess our roof and very knowledgeable. ... The job was complete in 2 days once work began."
Bryan S.Roof replacement
★★★★★
"Josh was especially amazing. He was professional, patient, and took the time to explain everything clearly so I felt comfortable and informed throughout the entire process. You can tell he genuinely cares about his customers and takes pride in his work."
Madison T.Roofing customer
FAQ

More questions

Can a tile roof be replaced without removing all the tile?

Sometimes the tile is lifted, the underlayment is replaced and sound tile is set back, which is often called lift and relay. Florida's residential code allows existing clay or cement tile to be reinstalled, but damaged, cracked or broken tile cannot be. A new covering cannot go over old tile.

What is under a tile roof?

The roof deck of plywood or boards, then underlayment, then flashing at edges, valleys and pipes, and often battens, which are thin wood strips tile can attach to. The FRSA and Tile Roofing Industry Alliance manual says the whole assembly has to be installed properly for the roof to work.

Do tile roofs need battens?

Not always. The FRSA and TRI Florida manual says battens are optional for roofs at 4:12 pitch and above, and that elevated or counter batten systems need a Florida product approval. Your tile type, pitch and the product approval for your tile decide which setup is used.

Is a tile roof too heavy for my house?

Tile is heavy, about 1,000 pounds per square according to a Journal of Light Construction article. The Tile Roofing Industry Alliance says the structure must support that weight and that if a home never had tile, an inspection decides whether more support is needed. A roofer or engineer checks the framing.

How do I know if my tile roof needs replacing or just repair?

The condition of the underlayment is what usually decides it, according to the Journal of Light Construction. Cracked or slipped tile can often be repaired. If the underlayment under good-looking tile has worn out, the tile has to come off to replace it. An inspection with a written photo report shows which case you have.

Want a straight answer on your tile roof?

Coastline Roofing can inspect your tile roof and send you a written photo report on what it needs. Tell us your town and what you are seeing.