How Long Can Roof Underlayment Be Exposed Before Shingles Go On?

It depends on the product, and a Florida evaluation can be stricter than the data sheet. Florida reports we read list 30 days for Atlas Summit 60 and GAF Deck-Armor, FeltBuster and Tiger Paw, and 180 days for Atlas Summit 180. TAMKO sets a 180-day UV limit. Check your product's limit before tear-off.

Your old roof is off and the new shingles are not on yet. How long can the layer in between sit there? Here are the limits makers and the state have written down.

Licensed & InsuredFlorida CCC1331076
4.7 stars65+ Google reviews
10 yearsFlorida-licensed
2,000+Roofs completed
The short answer

How long can roof underlayment be exposed?

It depends on the product, and the Florida evaluation for a product can be stricter than its data sheet. Some are 30 days, some are 180.

Underlayment is the layer under your shingles. Owens Corning's glossary describes it as asphalt-saturated felt or a specially engineered synthetic material used beneath roofing to give the deck more protection. It is meant to be covered. Every maker sets a limit on how long it can sit in the sun and weather before the roof covering goes on. Here are the limits we found in documents we opened.

Exposure limits for common synthetic underlayments, from the documents we read
ProductLimitWhere it is written
GAF Deck-Armor, FeltBuster, Tiger Paw, Shingle-Mate30 daysFlorida evaluation report FL10626-R16, Table 3 (revised October 17, 2019, written for the 6th Edition code)
GAF VersaShield180 daysSame report, Table 3
Atlas Summit 6030 days maximum exposure on the roof deckFlorida evaluation report FL21350-R5, 8th Edition (2023), issued December 19, 2023
Atlas Summit 180180 days maximum exposure on the roof deckSame report
TAMKO Synthetic ShieldMust not be exposed to UV rays for more than 180 daysTAMKO application instructions on file with Florida product approval (FL14864)

Read the table as examples, not a rule for every roof. The limit that counts is in the installation instructions and the Florida approval for the exact product on your roof. Those papers get revised, and a newer version may say something different from the ones we read. Atlas's Florida evaluation says that where the report, the code and the maker's instructions disagree, the more restrictive and code-compliant detail wins. When two limits are listed, plan to the shorter one.

This page covers synthetic underlayment. Felt has its own limits. See our guide to synthetic underlayment versus felt for how the two compare.

Roof open and a storm coming?

Coastline does temporary repairs and tarps, and sends a written photo report so you can see the deck and underlayment before the new roof goes on. Coastline Roofing works all over Florida (license CCC1331076).

Call (941) 896-7793 or text your town and a photo.

Why it matters

Why do the limits differ, and why do they matter?

Six reasons a number on a data sheet does not tell you how long a roof can safely sit open.

Sun breaks it down

TAMKO's 180-day figure is a UV limit. That is how long the product can sit in sunlight before it starts to lose strength. Florida has a lot of sun, so the clock matters here.

Lab numbers are not field numbers

A 2011 Fine Homebuilding article says makers list exposure limits from two months to 30 months, and says there is little evidence that a 12-month product performs differently from a four-month or six-month one. The article is old, but the point holds: ask for the written limit for your product.

Water resistant is not waterproof

TAMKO says its underlayment will not prevent wind-driven rain from entering the building and should not be used as the primary roof covering. It says the final roof covering must be installed before the structure is exposed to adverse weather such as wind-driven rain, high wind or hail.

Every fastener is a hole

Fine Homebuilding says synthetic underlayment punctured by staples or common roofing nails can leak through capillary action, and that plastic-cap nails or staples are a must. A roof that stays open longer gives water more time to find those holes.

Florida may be stricter

Atlas's Florida evaluation lists 30 days for Summit 60. Product pages and rolls may talk about longer UV ratings. When the sources differ, the evaluation says the more restrictive one prevails.

The warranty can depend on it

TAMKO says that failing to apply its underlayment according to its instructions could adversely affect coverage under the applicable limited warranty. Exposure limits are part of those instructions.

Mid-job

What does underlayment exposure mean in the middle of a roof replacement?

A roof is only as dry as its weakest day. Plan the tear-off so the crew can cover what they open before the limit and before the weather turns.

On a roof replacement, the crew removes the old roof down to the deck, installs underlayment, then installs the shingles or other roof covering on top. A longer gap between those steps can come from a storm forecast, late material, a permit or inspection hold, or a decision that is still pending. The longer the gap, the more the underlayment is doing a job it was only meant to do for a short time. Our guide on what to expect during a roof replacement walks through the whole job in order.

You do not need to know every product. You do need to ask a few plain questions before the tear-off starts.

  1. Which underlayment is going on my roof?

    Ask for the brand and product name. Ask where the exposure limit is written, and ask to see it.

  2. How much of my roof will be open at one time?

    A smaller open area is easier to cover quickly. Ask how the crew splits the roof into sections.

  3. What is the plan if the weather turns?

    Ask who covers the roof, with what, and how fast. A tarp is a short-term fix. See how long a tarp can stay on a roof.

  4. What happens if the job stalls past the limit?

    Ask whether the roofer will check the underlayment and replace it if needed, and ask for that in writing.

  5. Will I get dated photos?

    Ask for photos of the deck and the underlayment before the shingles go on. Coastline sends a written photo report with inspections. On a replacement, ask any roofer for dated photos.

Storm in the forecast?

Underlayment is not built to take wind. If a roof is open and a named storm is coming, the safe move is to cover it. Coastline does temporary repairs and tarps, including replacing worn-out FEMA tarps. See emergency roof tarping and our guide on what happens if it rains during a roof replacement.

Past the limit

What if the underlayment has been exposed too long?

Ask for a check before the shingles go on, and ask for the result in writing.

Atlas's Florida evaluation says installation has to follow the report, the code and the maker's instructions. TAMKO says that skipping its instructions could affect warranty coverage. We did not find a published test that says what happens to underlayment on day 31 or on day 181. So no one can honestly say a roof is fine or ruined from the day count alone. What helps is a look at the actual material.

  • Ask the roofer to check for tears, punctures and lifted laps, and to photograph them.
  • Ask whether the cap nails or cap staples are all in place.
  • Ask whether the deck under it has stayed dry. See roof deck damage after a Florida storm for what wet decking looks like.
  • Ask what the roofer has found on past tear-offs. Our guide on what roofers find during a tear-off explains what turns up.

If you are comparing roofing quotes, ask each roofer which underlayment they use and how long it can sit open. See how to compare two roof quotes in Florida. For the full picture of a new roof, see our roof replacement page.

Types

Felt, synthetic and peel-and-stick: what is the difference?

They are different products with different limits, so a number for one does not apply to another.

Owens Corning's glossary defines felt as fibrous material saturated with asphalt. It describes synthetic underlayment as typically made from polypropylene and used as an alternative to felt. It describes self-adhering shingle underlayment as a waterproofing product designed to protect against water getting in from wind-driven rain, and says the code requires it to meet ASTM D1970 and carry that label.

Florida also requires roofing products to be approved. Under Florida Statute 553.842, roofing products need statewide approval before they are used. The approval documents are where exposure limits like the ones above are written. See our guide to Florida product approval for roofing to learn how to look one up.

Reviews

What homeowners say about working with Coastline

★★★★★
"From beginning to end the roof was done in 2 days. One night the crew stayed until 8:00. Each evening before leaving the crew ensured the yard was cleaned. We are so happy, and our roof is beautiful!"
Sharon T.Roof replacement
★★★★★
"Russell was great to work with. He was prompt in coming out to assess our roof and very knowledgeable. ... The job was complete in 2 days once work began."
Bryan S.Roof replacement
★★★★★
"Josh was especially amazing. He was professional, patient, and took the time to explain everything clearly so I felt comfortable and informed throughout the entire process. You can tell he genuinely cares about his customers and takes pride in his work."
Madison T.Roofing customer
FAQ

More questions

Can underlayment be used as a temporary roof for months?

Some data sheets list months of exposure, and Fine Homebuilding reported in 2011 that most synthetics can be left exposed for six months and some for twelve. But the Florida evaluations we read for GAF and Atlas Summit 60 list 30 days, and TAMKO says its product should not be the primary roof covering. Follow the shortest written limit.

When does the exposure clock start?

Atlas's Florida evaluation says exposure on the roof deck is limited to a maximum number of days, which reads as counting from the day it goes down. If a date is unclear, ask the maker. Ask the roofer to record the install date in your photos or on the work order.

Do asphalt felt underlayments have the same limits?

Felt is a different product with its own instructions. We did not find a Florida document for felt to cite here. Ask the roofer for the written limit for the brand on your roof, and see our guide on synthetic underlayment versus felt for how the two compare.

Will a rain shower ruin underlayment that is already installed?

Underlayment is designed to shed water, but TAMKO says its product will not prevent wind-driven rain from entering the building. The bigger problems are open fastener holes and long gaps. If rain is in the forecast, ask how the roof will be covered that day.

What if a data sheet says six months but a Florida report says 30 days?

Atlas's Florida evaluation says that where the report, the code and the maker's instructions disagree, the more restrictive and code-compliant detail prevails. In practice, plan to the shorter number and ask the roofer to show you the Florida approval for the product.

Get a roof plan with photos and a straight answer

Coastline sends a written photo report, so you can see what is on your deck and what the plan is before the new roof goes on.