Metal Roof Installation Process: Step by Step

A metal roof install runs in order: plan the roof, tear off the old covering, repair the deck, add underlayment, snap layout lines, set eave and valley trim, install clips and panels, seam them, then finish penetrations, ridge and trim. The panel maker's instructions control every detail.

Before a crew shows up, it helps to know the order of work, what you will see and what to ask. Here is the full process.

Licensed & InsuredFlorida CCC1331076
4.7 stars65+ Google reviews
10 yearsFlorida-licensed
2,000+Roofs completed
The basics

What is the metal roof installation process?

A metal roof goes on in a set order: plan, tear off, repair the deck, dry in, trim the edges, set and seam the panels, then finish the ridge and details.

A metal roof is a system, not just panels. The order matters because each layer protects the one under it. Sheffield Metals, a coil supplier, publishes a video guide that follows the same sequence a good crew follows on a re-roof: shingle tear-off, deck repair, underlayment, perimeter flashing, valleys, first panels, closures, penetrations and the ridge. McElroy Metal, a panel maker, lays out a similar order for residential standing seam in its installer guide.

Coastline installs metal roofs in 24-gauge standing seam and 5V crimp. The steps below follow the manufacturers' published guides. The panel maker's own instructions for your roof always come first, because clip type, spacing and sealant differ from one system to the next. Sheffield says as much: its video is for reference only and projects should follow the published installation details.

Planning a metal roof?

Coastline installs 24-gauge standing seam and 5V crimp metal roofs. We can inspect your roof first and give you a written photo report so the plan starts from what is really up there. Coastline Roofing works all over Florida (license CCC1331076).

Call (941) 896-7793 or text your town and a photo.

Step by step

What happens on a standing seam roof, step by step?

Here is the order of work, from the old roof to the final walk.

  1. Plan the roof before ordering

    McElroy says to confirm the panel system fits the job, check panel lengths and review eave, valley, transition and rake trim before anything is ordered. Snap-lock and mechanically seamed panels need different tools.

  2. Tear off the old roofing

    On a shingle re-roof, the crew strips the old shingles down to the deck. This is when hidden problems show up. See roof tear-off surprises for what crews find.

  3. Inspect and repair the deck

    McElroy says to inspect the substrate and repair damaged or uneven areas before underlayment. A flat, sound deck also helps prevent oil canning. Our guide to roof deck damage covers the signs of rot.

  4. Dry in with underlayment

    The underlayment is the layer between the deck and the metal. Sheffield lists it as the step that dries in the roof before any trim or panels go on. The type depends on the panel maker and the building code.

  5. Snap layout lines and set the eave and perimeter trim

    McElroy says to snap lines, mark where panels start and end, and adjust now to avoid a thin sliver of panel at the far rake. Eave trim goes on first, then the layout is rechecked.

  6. Flash the valleys

    Sheffield's guide shows perimeter flashing and the valley before the first panels.

  7. Set the first panel and attach clips

    The first panel sets the alignment for every panel after it. Clips hold the panel to the deck and let it move with the temperature. McElroy says to use the specified fasteners and spacing.

  8. Apply sealant and check as you go

    Sealant type and placement come from the maker, because mistakes can hurt water management. McElroy says experienced installers check modularity (how true the panels are running) every five to seven panels to catch drift early.

  9. Seam the panels

    Snap-lock profiles connect directly. Mechanically seamed profiles need special seaming equipment and the maker's procedure.

  10. Finish penetrations, ridge and trim

    Pipe boots, closures and the ridge detail go on after the panels. Then the crew walks the roof for a final inspection, per McElroy.

5V crimp

How is a 5V crimp roof different?

A 5V crimp roof uses exposed fasteners instead of hidden clips, so the screw placement matters even more.

Roof Observations, a roofing consultancy, says exposed-fastener panels have pre-drilled holes and specified fasteners made to allow the panel to move. That is the main difference from standing seam, where hidden clips do the same job. The prep steps are the same: a sound deck, a dried-in roof, trim, then panels.

On either style, the risk is pinning a panel, which means holding it so it cannot move with heat. Roof Observations notes that nails through panels and tight hole cuts around pipes are common causes of waviness later. Read more in our 5V crimp metal roof guide, our standing seam guide, and standing seam vs 5V crimp.

Florida rules

What does Florida require for a metal roof install?

Florida requires a licensed roofer, panels that suit your wind zone and a roof that follows the maker's instructions.

Who may do the work. The Florida Roofing and Sheet Metal Contractors Association says to hire a state-licensed roofing contractor and verify the license with the state DBPR search or your local building department. Licensed contractors cannot subcontract roofing to unlicensed roofers. Our guide to how to verify a Florida roofing license shows the steps. Coastline's license is statewide.

The slope and panel type. A model building code article summarized by Building Enclosure magazine says architectural metal panels (water-shedding, flat pan with side ribs) need a designed slope of at least 3:12, while structural metal panels, whose seams are sealed to resist water, can go at lower slopes. Your roof's pitch decides which style fits. See roof pitch explained.

Wind. IBHS, the insurance industry's research group, says in its FORTIFIED Roof standard that metal roofs must be tested for design pressures set for the specific address, and that the roof deck must be sealed so water cannot get in if the covering is lost. It also calls for ring-shank nails in the deck, which IBHS says can double uplift resistance. FORTIFIED is a voluntary program, not a code, but it shows what strong installs look like.

The permit. Permit rules come from your county or city building department. Our guide to roof permits in Florida and your county's building department have the details for your address.

Quality and warranty

How do you know the install was done right?

The roof should match the maker's instructions, the photos should show each step and the warranty paper should match what was installed.

Sheffield Metals says some warranties, including weathertightness warranties, rely on the installer following the maker's approved details. It also warns that a side lap warranty may cover seams only and not flashing zones, which it says is where most leaks occur. Ask which warranty you are getting and what it covers. Our roof warranty types guide explains the common kinds.

On Coastline jobs, Josh reviews every job through photo reports. Ask any roofer for photos of the deck, the underlayment and the trim before the panels hide them. Our what to expect during a roof replacement guide covers the full job from the homeowner's side.

Ask for photos at these points, because the panels will hide them:

  • The bare deck after tear-off and repair.
  • The underlayment, fully installed and lapped.
  • The eave, rake and valley trim before panels cover the edges.
  • Each pipe, vent and other opening once it is flashed.

How does metal hold up in a storm? After Hurricane Ian, a FEMA study reported by WUSF found that about 90 percent of homes with roofs installed before 2015 were damaged, versus 28 percent of homes with roofs installed after 2015, and that metal panel roofs were far less likely to be damaged and did not follow the same age pattern. That is about roofs in Ian's path, not a promise for any one roof. Quality of the install still decides the result. For price drivers, see metal roof cost in Florida.

Sheffield's own guide ends the install the same way McElroy's does: finish the details, then walk the whole roof and inspect it before the crew leaves. Ask your roofer to show you that final inspection in photos.

Reviews

What homeowners say about working with Coastline

★★★★★
"From beginning to end the roof was done in 2 days. One night the crew stayed until 8:00. Each evening before leaving the crew ensured the yard was cleaned. We are so happy, and our roof is beautiful!"
Sharon T.Roof replacement
★★★★★
"Russell was great to work with. He was prompt in coming out to assess our roof and very knowledgeable. ... The job was complete in 2 days once work began."
Bryan S.Roof replacement
★★★★★
"Josh was especially amazing. He was professional, patient, and took the time to explain everything clearly so I felt comfortable and informed throughout the entire process. You can tell he genuinely cares about his customers and takes pride in his work."
Madison T.Roofing customer
FAQ

More questions

Does the old roof have to come off first?

The guides cited here start with tear-off and a deck inspection. Sheffield Metals lists shingle tear-off and deck repair as the first steps, and McElroy Metal says to repair damaged or uneven substrate before underlayment. Whether a new roof can go over an old one depends on the deck, the code and the maker, so ask for the reason in writing.

Why does the underlayment matter on a metal roof?

The underlayment is the backup layer that dries in the roof before panels go on. Sheffield Metals lists it as a distinct step before trim and panels. Which type to use comes from the panel maker's instructions and the Florida Building Code, so ask your roofer which product the maker requires.

Do metal panels need room to move?

Yes. Metal expands and contracts with temperature, so panels must be able to slide. Roof Observations says restraint at fasteners, clips or penetrations almost always causes waviness, and that you cannot pin panels in place. This is why clip type, spacing and fastener placement come from the maker.

Do I need a permit for a metal roof in Florida?

The rules for your address come from your county or city building department, so check there or with your roofer before work starts. Florida roofing work must be done by a licensed contractor, per the Florida Roofing and Sheet Metal Contractors Association. Ask who is pulling the permit and get that in your contract.

Is the order different for tile or shingle?

The core idea is the same: sound deck, dry-in layer, edge details, then the covering. The details differ, such as battens or foam for tile and nail patterns for shingles. For metal, the panel maker's instructions set every detail.

Start a metal roof plan from a real inspection

Coastline can inspect your roof and give you a written photo report, so the plan for a metal roof starts from what is really up there.